The establishment and development of the Renewable Energy Department

The Renewable Energy Department was established in 2013 during the restructuring of the Company, on the basis of separating the consulting segment on renewable energy (RE) of the Power Grid Project Department. However, consulting services on renewable energy have been provided to customers by the Company since 2004.

nang luong tai tao 3
The Renewable Energy Department

Personnel

The total number of RE specialists includes 10 people, including 3 masters and 7 engineers, with deep understanding of RE technologies, especially wind and solar power; clearly understand the guidelines and policies of the Government, procedures and processes for the development of RE projects in Vietnam. The specialists, in addition to professional qualifications, are also equipped with English, can easily work with foreign customers.

The main function and task of the RE department is to perform consultancy on potential assessment, planning, site selection, investment project formulation, and design for projects using RE for power generation.

The Department of Renewable Energy is a unit that is always at the forefront of the field of Vietnam’s renewable energy, understands the Vietnamese power system well, and has experience in successfully implementing RE development planning (wind, solar, biomass) for many provinces, understand and have experience in surveying and screening potential locations for wind and solar energy, identifying the most promising locations for survey and measurement.

The bright spot of the renewable energy room

The department has experience in designing and erecting more than 100 wind measuring masts (height from 45m to 120m) in islands and many provinces such as Ninh Thuan, Binh Thuan, Lam Dong, Soc Trang, Tra Vinh, Ben Tre, Gia Lai, Dak Lak, Binh Dinh, Phu Yen, Quang Binh, … participate in implementing many wind power and solar power projects with a capacity from a few MW to thousands of MW.

The Department has also participated in many important projects as an independent/joint venture with international consultants in internationally sponsored projects such as the Vietnam Wind Map project (the investor of the World Bank), the project to collect wind measurement data and policies related to wind power (the investor of the General Department of Energy), the project to install and operate 10 wind measuring masts 80m (the investor of the KfW Bank) and was selected in the above projects.

The experts of RE Department have been invited to contribute expert opinions to many domestic and foreign specialized seminars, the Department is the first consulting unit sought by foreign customers.

Representative projects

During the operation, all officers and employees of the RE Department have constantly made efforts to achieve many achievements and contribute to the company. It is possible to mention typical works marking work achievements.

Phu Lac wind power plant:

Phu Lac is one of the first wind power projects in Vietnam. The Renewable Energy Department has participated in searching, selecting locations, surveying and assessing wind potential and making consulting documents for the project’s phases. This is a project using a loan from KfW Bank (Germany), requiring international EPC bidding.

The Department of Renewable Energy has entered into a partnership with consultant Fitchner to win the consultancy contract for the implementation of the Phu Lac wind power plant project. Although this is a new type of work, for the first time, the staff of the Renewable Energy Department had to make great efforts to both work and study, but the department successfully completed it without any errors and participated in commissioning successfully, on schedule in September 2016. This is the premise for the Company to continue to provide similar services in the future.

Mapping Vietnam’s wind potential funded by the World Bank:

Since 2001, the World Bank has published the document Wind Atlas for Southeast Asia, including Vietnam, which is widely used as a document for the development of wind power projects in Vietnam. In the process of using, realizing that there is a big difference between the document and the direct measurement results of the projects, the World Bank plans to re-implement this document through the project “Assessment of wind resources at selected locations in Vietnam”.

In 2008, the Renewable Energy Department was trusted and selected by the World Bank as a local consultant along with the American consultant (the True Wind Solution) to implement this project. The results of the project are maps of Vietnam’s wind potential with 3 altitudes of 60m, 80m and 100m, which are used by the Ministry of Industry and Trade and investors as research and evaluation documents on wind potential areas in Vietnam.

Installation and operation of ten of 80m-high wind measuring masts sponsored by the GIZ:

From 2011-2014, in order to promote the development of wind power projects in potential areas through monitoring and providing detailed data sets according to international standards to investors in need, the GIZ sponsored the Ministry of Industry and Trade to install 10 of 80m- high wind measuring masts in localities with wind potential. The Department of Renewable Energy is trusted to implement this project. Through the project, the experts of the Renewable Energy Department better understand the picture of Vietnam’s wind potential, creating a premise for the unit to be trusted by investors for a series of wind power projects.

Vietnam wind power development planning (2012) invested by General Department of Energy (Ministry of Industry and Trade):

The General Department of Energy is the advisory unit of the Ministry of Industry and Trade on Renewable Energy. Realizing the ability and experience of PECC3 in the field of wind power, in 2012, the General Department of Energy assigned PECC3 to implement the above project. This is Vietnam’s first and sole project on onshore wind power planning on a national scale. The successful project further enhances PECC3’s reputation in the field of wind power.

Ke Ga offshore wind power project (Thang Long Wind):

In 2019, the Renewable Energy Department is selected as one of the units participating in the first offshore wind power project in Vietnam (off the coast of Ke Ga Cape, Binh Thuan province with a total expected capacity of 3400MW, phase 1 (600MW) is called Thang Long Wind project). Tasks include participating in making additional planning report, collecting and analyzing wind potential assessment data from Lidar anemometers placed on the rig, ….

With this project, PECC3 once again is a pioneer consulting unit in the field of offshore wind power in Vietnam. After the Thang Long Wind project, many investors of other offshore wind power projects have come to PECC3 to contract for consulting services for technical assessment, assessment of grid connectivity, assessment of wind potential and layout wind turbine optimization, etc…

List of all projects of the Department of Renewable Energy

Project’s Name Year of implementation
Wind energy planning for power generation in southern coastal provinces 2006
Site selection and installation wind measurement mast at 15 wind projects in Côn Đảo, Bắc Bình, Tuy Phong, Thuận Bắc, Ninh Phước, Chư Prong, Lạc Dương 2007-2009
Pre-FS An Phong Wind Power Plant 180MW 2007
Pre-FS Nhơn Hội Wind Power Plant 27MW 2007
Pre-FS Đình Hải Rice Husk Power Plant 7MW 2007
Pre-FS Long An bagasse cogeneration plant 30MW 2008
Wind resource assessment at selected sites in Vietnam (3 sites in Ninh Thuan, Binh Thuan and Gia Lai), the WB 2008-2011
Pre-FS Thuận Nhiên Phong Wind Power Plant 50MW 2008
Pre-FS Phước Thể Wind Power Plant 30MW 2008
Pre-FS Langbiang Wind Power Plant 40MW 2008
Pre-FS Sài Gòn – Bình Thuận Wind Power Plant 200MW 2008
Pre-FS Phú Lạc Wind Power Plant 90MW 2009
Pre-FS PVP Wind Power Plant 165MW 2009
Assessment of wind potential in Lam Dong province 2009
Wind power development planning in Binh Thuan province 2009
Pre-FS Duyên Hải Wind Power Plant 93MW 2010
Pre-FS Trung Nam Wind Power Plant 90MW 2010
Pre-FS và MT Enfinity Wind Power Plant 124.5MW 2010
Wind power development planning in Ninh Thuan province 2010
Power system planning on Phu Quoc island 2011
Installation and operation of 10 80m-high wind measuring masts at selected locations_GIZ project 2011-2014
Vietnam Wind Power Development Plan 2012
Research on integrating wind power into Vietnam’s power system 2012
Pre-FS IMPSA Wind Power Plant 81.9MW 2013
Pre-FS Thanh Phong Wind Power Plant 59.4MW 2013
Pre-FS Hanbaram Wind Power Plant 102.6MW 2013
Installation and operation of 02 80m wind measuring masts in Da Loan, Lam Dong province 2013
Research on integrating wind power into Vietnam’s power system (phase 2) 2014
Consulting on implementation of Phu Lac Wind Power Plant 24MW 2014
Verification of Cong Ly wind power project (gđ2) 2014
Wind power development planning in Bac Lieu province 2014
Supplementing the planning of Cau Dat wind power project 30MW 2014
Planning for development of power system in Con Dao island 2014
Supplementing the planning of TBC Phước Minh wind power project 30MW 2014
Biomass Power Development Plan in Hau Giang province 2014
Supplementing the planning of Dak Nông Solar Power Plant 30MWp 2015
Supplementing the planning of Vĩnh Hảo Solar Power Plant 30MWp 2015
Supplementing the planning of Quốc Vinh Wind Power Plant 30MW 2016
Supplementing the planning of Bình Thuận Solar Power Plant 30MWp 2016
Supplementing the planning of Tiến Thành BTP Wind Power Plant 20MW 2016
Supplementing the planning of Đầm Nại Wind Power Plant 40MW 2016
Supplementing the planning of Trị An Solar Power Plant 126MWp 2016
Supplementing the planning of Sao Mai Solar Power Plant 210MWp 2016
Supplementing the planning of Srepok 4 Solar Power Plant (100MWp) 2017
Supplementing the planning of Cư Jut Solar Power Plant 50MWp 2017
Supplementing the planning of Dầu Tiếng Lake Solar Power Plant 2,000MWp 2017
Supplementing the planning of Đa Dâng 2 Solar Power Plant (20MWp) 2017
Supplementing the planning of Mỹ Sơn Solar Power Plant 100MWp 2017
Supplementing the planning of Quảng Trị Solar Power Plant 50MWp 2017
Supplementing the planning of Phú Yên Solar Power Plant 100MWp 2017
Supplementing the planning of Vĩnh Long Solar Power Plant 50MWp 2017
Supplementing the planning of Bắc Bình Solar Power Plant 30MWp 2017
Supplementing the planning of Sonadezi Châu Đức Solar Power Plant 100MWp 2017
Supplementing the planning of GAIA Long An Solar Power Plant 100MWp 2017
Supplementing the planning of Thuận Nhiên Phong Solar Power Plant 86MWp 2017
Supplementing the planning of BCG Băng Dương  Solar Power Plant 40MWp 2017
Supplementing the planning of Red Sun Thạnh An Solar Power Plant 60MWp 2017
Supplementing the planning of Tân Châu Solar Power Plant 50MWp 2017
Supplementing the planning of Phước Hữu ĐL1 Solar Power Plant 30MWp 2017
Supplementing the planning of Hồng Phong 3.3 Solar Power Plant (50MWp) 2017
Supplementing the planning of Vĩnh Hải Wind Power Plant 40MW 2017
Supplementing the planning of Đầm Nại Wind Power Plant phase 2 (34MW) 2017
Verification of Đa Mi Floating Solar Power Plant 50MWp 2017
RE Power Development Plan in Tay Ninh Province 2017
Supplementing the planning of  B&T Wind Power Plant 200MW 2017
Solar Power Development Plan in Sóc Trăng Province 2017
Supplementing the planning of Hoàn Cầu Long An Solar Power Plant 50MWp 2017
Supplementing the planning of  Châu Pha Solar Power Plant 48MWp 2017
Supplementing the planning of  Goldwind Wind Power Plant 22MW 2018
Solar Power Development Plan in An Giang Province 2017-2018
Supplementing the planning of Văn Thanh Wind Power Plant phase 2 (50MW) 2017
Supplementing the planning of Hồng Phong 3.5 Solar Power Plant 48MWp 2017
Supplementing the planning of Đồng Xoài Solar Power Plant 48MWp 2017-2018
Power supply for Bach Long Vy island district 2018
FS of Easup Solar Power Plant 50MWp 2018
FS of BMT Solar Power Plant 30MWp 2018
Supplementing the planning of Marshal An Giang Solar Power Plant 50MWp 2018
Technical review of Sinenergy Solar Power 2018
Supplementing the planning of Đầm Nại 4 Wind Power Plant 2018
Verification of the FS of Sông Bình 1 Solar Power Plant 50MW 2018
Wind Power Development Plan in Quảng Bình province 2018
Supplementing the planning of Đồng Nơ Solar Power Plant 50MWp 2018
FS of Sunpro-Bến Tre No.8 phase 1 Wind Power Plant 30MW 2018
Preparing the PPA for Tuy Phong Solar Power Plant 30MWp 2018
Supplementing the planning of Goldwind phase 2 Wind Power Plant 2018
Supplementing the planning of Lợi Hải 2 Wind Power Plant 30MW 2018
FS of Hướng Phùng 1 Wind Power Plant 30MW 2018
FS of Banpu Sóc Trăng phase 1 Wind Power Plant 30MW 2018-2019
Supplementing the planning of số 3 (Banpu) gđ 2 Wind Power Plant 30MW 2018-2019
FS of Korea – Trà Vinh phase 1 Wind Power Plant 48MW 2019
Supplementing the planning of AMI AC Dăk Lăk Wind Power Plant 202.5 MW 2019
FS of Goldwind phase 1 Wind Power Plant 2019
Evaluation of wind potential in Kê Gà Off-shore Wind Power Plant 3,400MW 2019-2020
Supplementing the planning of Ái Tử Floating Solar Power Plant 50MWp 2019
Technical Design for Sao Mai Solar Power Plant 106MWp 2019
Supplementing the planning of An Biên Solar Power Plant 11MWp 2019
Preparing FS, Detailed Design for complex of RE projects in Deep C industrial park 2019-2020
Supplementing the planning of Phú Lạc phase 2 Wind Power Plant – 26MW 2019-2020
Supplementing the planning of Chí Công –Phong Phú Solar Power Plant 50MWp 2019
FS of Trung Nam Trà Vinh (V3-6) Wind Power Plant 348MW 2019-2020
Research report for the development of Soc Trang Off-shore Wind Project 2020
FS of Phước Nam Enfinity Wind Power Plant 65MW 2020
Supplementing the planning of An Thuỷ Wind Power Plant 50MW 2020
Development of Technical Risk Management Guidelines for Ground Mounted Solar Projects 2020
Supplementing the planning of Hòn Đất Waste-to-Energy Power Plant 10MW 2020
Evaluating the grid impact of Gia Lai Wind Power Plant 120MW 2020
Supplementing the planning of Đăk Rơ Sa Solar Power Plant 30MWp 2020
FS of Xanh Sông Cầu phase 1 Wind Power Plant (50MW) 2020
FS of Đông Hải 1 (V1-7) Wind Power Plant 125MW 2020
Verification of FS of Hàm Kiệm Wind Power Plant 15MW 2020
Technical Design/ Detailed Design of Đông Hải 1 (V1-7) Wind Power Plant 125MW 2020-2021
Supplementing the planning of Ba Tri Off-shore Wind Power Plant 800MW 2020
Supplementing the planning of Thanh Phong Wind Power Plant 50MW 2020
Supplementing the planning of Chư Prong 3 Wind Power Plant 150MW 2021
FS NMĐG Hiệp Thạnh 3 (V3-8) Wind Power Plant 210MW 2021
Evaluation of wind potential, micro siting for turbines at Co Thach Off-shore Wind Power Plant 2,000MW 2021
Supplementing the planning of Lục Ngạn Wind Power Plant 78MW 2021
Support to apply for a license to survey the wind potential of Binh Thuan Off-shore Wind Power Plant 1,500MW 2021-2022
Supplementing the planning of Korea- Trà Vinh gđ2 Wind Power Plant (48MW) 2021
Technical Design of No.18 Sóc Trăng Wind Power Plant 2021

The Renewable Energy Department is considered as the solution and trend of all elements of energy in the world today. PECC3 hopes that a company-wide effort will bring renewables back into the mainstream in the coming years. To make up, the room quality up must be grapation the same family of PECC3 aims to devise special development strategies.