Power Engineering Consulting Joint Stock Company 3 - The best solution for the best choice
cancel

Environment

The department establishment and development process

Since the late 1990s, the assessment of impacts and environmental protection has been put into a criterion for evaluating the quality of investment projects by the State. In anticipation of this trend, the Company has established an Environment Division under the Computer and Environment Department, specializing in the task of preparation of environmental impact assessment reports for power and grid projects which the company is the Consulting contractor.

Along with the growth of the Company and the rapidly increasing demand for environmental and social impact assessment reports as well as other related reports, on July 1, 2013, the Company separated the The Environment Division from Computer and form Environment to the Environment Department.

The role of the department in a project

The Environment Department is involved in project development process from site planning to the PreFS documentation and FS preparation phases, with the task of implementing sectoral reports include:

  • (i) Environmental Impact Assessment (EIA), (ii) Environmental and Social Impact Assessment (ESIA), (iii) Resettlement and Compensation Plan (RP), (iv) Ethinic Minorities Development Plan (EMDP) for power and grid projects in accordance with Vietnam’s standards and international credit institutions such as: WB, JBIC, ADB,…;
  • Other consulting activities: Design cleanup of hydroelectric reservoir bed; Develop an Emergency Response Plan for Hydropower Plants resulting from flood discharge and/or dam failure; calculate cooling water heat spread and thermal power plant emissions.
  • In addition, the department also deepens and completes environmental impact assessment reports for renewable energy projects such as wind energy, solar power…

The department constantly set criterias to strive for: completing the tasks on schedule with the quality of the products checked and perfected, improving the capacity and professional ability of the department personel, with the expectation is to ensure the sustainable development of the project, in addition, to become a reliable tool for appraisers and investors to consult before making project decisions, thereby gradually becoming a leading environmental and social consultant for energy projects.

Examplifies project

1. Renewable Energy Project

  • Prepare EIA report of Sao Mai Solar Power Plant (PV) – 210MW: this is the first EIA report for the solar power project appraised and approved by the Ministry of Natural Resources and Environment nationally.

2. Hydropower Project

  • Song Bung 4 – 156MW Hydropower: EIA report preparation, Compensation and resettlement master plan, documents for ADB loan service: this is a highly complex project and ireceived critical aclaim by ADB
  • Preparing Emergency response plan for cascade hydropower dams on Dong Nai river basin system for Da Nhim hydropower, Dai Ninh hydropower and Dong Nai 3, 4 hydropower.

3. Tranmission project

  • Cluster of 03 projects: 500kV Phu My – Song May transmission line, Song May – Tan Dinh transmission line and 500kV Song May substation:
    Resetlement Plan (RP) and Environment and Social Impact Assessment (ESIA), this is the first WB loan 500kV project of the deparment.

4. Thermal Power Project

  • Vinh Tan 4 Expansion Power Plant Project: The project’s EIA report is of high scale and complexity, with close relation with other plant of Vinh Tan Power Center in the allocation of emission quota.
  • Vinh Tan 4 thermal-power plant project: package of environmental and social Action plan for IFC loan, this is the first environmental & social document to be implemented in arcordance to IFC’s standards.

Statistics of projects perform by the Environment Department

1. Renewable Energy Projects

No. Project Investor Work Time
1 Hoa Thang 1 Wind Farm Petro Vietnam Power Corporation (PV Power) Environmental Impact  Assessment (EIA)
Resettlement and Compensation Plan (RP)
2012
2 Loi Hai Wind Farm Thuan Binh Wind Power Joint Stock Company Environmental Impact  Assessment (EIA)
Resettlement and Compensation Plan (RP)
2013
3 Sao Mai  Solar  Farm– 210MW Trung Nam Wind power Joint Stock Company Environmental Impact  Assessment (EIA) 2015
4 Cong Hai 1 Wind farm Sao Mai Group Corporation Environmental Impact  Assessment (EIA) 2017
5 Chau Duc Solar farm PMU of O Mon Power Center Environmental Impact  Assessment (EIA) 2018
6 Vinh Tan Solar farm SH Solar Farm Vina Co., Ltd – Halla E&C CO.,LTD, Hyosung Group Environmental Impact  Assessment (EIA) 2018
7 EASUP Solar farm Vinh Tan Thermal Power Plant Management Board Environmental Impact  Assessment (EIA) 2018
8 Sunpro wind farm – Ben Tre AES Group Environmental Impact  Assessment (EIA) 2019
9 Điện gió Sunpro – Bến Tre Sunpro Construction Service Trading Co., Ltd Environmental Impact  Assessment (EIA) 2019
10 Trung Nam Tra Vinh wind farm V3-6 Trung Nam Group Environment Protection Plan (EPP) 2020-2021
11 Phuoc Nam Enfinity Wind farm – Ninh Thuan (onshore) Trung Nam – Phuong Dong Renewable Energy Company Limited Environment Protection Plan (EPP) 2020-2021
12 Dong Thanh 1 Wind farm – Tra Vinh (onshore) Dong Thanh Wind Power Company Limited 1 Environmental Impact Assessment (EIA) 2021
13 Dong Thanh 2 Wind farm – Tra Vinh (onshore) Dong Thanh Wind Power Company Limited 2 Environmental Impact Assessment (EIA) 2021
14 Co Thach Wind farm (offshore) Scatec Asa Preliminary Environmental Report (PER) 2021

 

2. Hydro-power Project

No. Project Investor Work Time
1 Song Bung 2 Hydro-power – 126MW Hydropower project management board 3 Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
Scheme of surface water exploiting
Design for clenning of the lake bed
2005-2007

2012
2013

2 A Luoi Hydro-power – 150MW Central Hydropower Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
Flood Prevention Plan
2006-2007
2014
3 Da M’Bri Hydro-power – 75MW Southern Hydropower Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
Flood Prevention Plan
2004-2005

2013

4 Song Bung 3 Hydro-power – 8MW Central Rural Power Project Management Board Environmental Impact Assessment (EIA)

Resettlement and Compensation Plan (RP)

2009-2011
5 Song Bung 3A Hydro-power – 20MW Hydropower Joint Stock Company – Da Nang Electricity Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2009-2011
6 Song Bung 4 Hydro-power – 156MW Hydropower project management board 3 Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
Design for clenning of the lake bed
2006-2008

2013

7 Vinh Son 2-3 Hydro-power – 102MW Vinh Son – Song Hinh Hydropower Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2007-2008
8 Vinh Son 5 Hydro-power – 24MW Vinh Son Investment Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2007-2008
9 Song Giang 1 Hydro-power Song Giang Hydropower Exploitation Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2010
10 Thac Ba Hydro-power – 18MW Vietnam Investment Construction and Trading Joint Stock Company Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2010-2013
11 Dong Nai 5 Hydro-power PMU of Dong Nai Hydropower Plant 5 Environmental monitoring report
Scheme of surface water exploiting
2014

2016

 

Develop an Emergency Response Plan for Hydropower Dams caused by flood discharge and/or dam failure:

No. Project Investor Work Time
1 Ham Thuan – Da Mi Hydropower
Da Nhim Hydropower
Da Nhim – Ham Thuan – Da Mi . Hydro power Joint Stock Company Flood Prevention Plan 2013
2 Dai Ninh Hydropower Dai Ninh Hydropower Joint Stock Company Flood Prevention Plan 2014
3 Se San 3A Hydropower Se San 3A Electric Investment & Development Joint Stock Company Flood Prevention Plan 2018
4 Da Nhim Hydropower Da Nhim – Ham Thuan – Da Mi . Hydropower Company Flood Prevention Plan 2018
5 Buon Tua Srah, Buon Kuop, SerBok 3 Hydropower Buon Kuop Hydropower Company Emergency Situations Response Plan 2020-2021
6 Da Nhim Hydropower Da Nhim – Ham Thuan – Da Mi . Hydropower Company Emergency Situations Response Plan 2020-2021
7 Ham Thuan – Da Mi Hydropower Da Nhim – Ham Thuan – Da Mi . Hydropower Company Emergency Situations Response Plan 2020-2021
8 Dong Nai 3,4 Hydropower Dong Nai Hydropower Company Emergency Situations Response Plan 2020-2021
9 Se San 4 & 4A Hydropower Se Sab Hydropower Development Company Emergency Situations Response Plan 2021

 

3. Tranmission Project

No. Project Investor Work Time
1 Song May – Tan Dinh 500kV Tranmission Line and Song May 500kV Sub-Station Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2004-2006
2 Quang Ninh – Hiep Hoa 500kV Tranmission Line Central Power Management Board (CPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2004-2006
3 Duc Hoa 500kV Substation Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2012-2015
4 Song May – Tan Uyen 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2012-2013
5 Long Phu – O Mon 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2012-2013
6 Bac Ninh 2 – Pho Noi 500kV Tranmission Line Nothern Power Management Board (NPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2012-2015
7 Thot Not – Duc Hoa 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2007-2008
8 Song Hau – Duc Hoa 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2013-2016
9 Tan Uyen 500kV Substation Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2010
10 Chon Thanh 500kV Substation Central Power Management Board (CPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2015
11 Nghi Son 2 thermal power station Connecting 500kV Tranmission Line Central Power Management Board (CPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2015-2016
12 Chon Thanh – Duc Hoa 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2015-2016
13 Long Thanh 500kV Substation Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA) 2017
14 Long Thanh – turn Phu My – Song May 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA) 2017
15 Nhon Trach 4 – turn Phu My – Nha Be 500kV Tranmission Line Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA) 2019
16 Vinh Yen 500kV Substation Nothern Power Management Board (NPMB) Environmental Impact Assessment (EIA) 2019-2020
17 Tay Ninh 1 500kV Substation Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA) 2019-2021
18 Krong Buk – Tay Ninh 1 500kV Tranmission Line Southern Power Management Board (SPMB) Establish Environmental and Social Policy framework for REACH project – loan from WB
Environmental Impact Assessment (EIA)
2020-2021
19 Long An 500kV Substation Southern Power Management Board (SPMB) Environmental Impact Assessment (EIA) 2020-2021
20 Hai Phong – Thai Binh 500kV Tranmission Line Nothern Power Management Board (NPMB) Environmental Impact Assessment (EIA) 2020-2021
21 Krong Buk 500kV Substation Central Power Management Board (CPMB) Environmental Impact Assessment (EIA) 2020-2021
22 Central gas turbine – Krong Buk 500kV Tranmission Line Central Power Management Board (CPMB) Environmental Impact Assessment (EIA) 2019-2021
23 Switchyard of Dung Quat Power Centre 500kV Subsation Central Power Management Board (CPMB) Environmental Impact Assessment (EIA) 2020

And more than 300 projects with voltage of 220kV and 110kV.

 

4. Thermal Power Plant Project

No. Project Investor Work Time
1 Nghi Son 1 Thermal Power Plant – 600MW Thermal Power Project 2 Management Board Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
Environmental monitoring during construction
2004-2005

2009-2014

2 O Mon IV Thermal Power Plant – 750MW Thermal Power Project 3 Management Board Environmental Impact Assessment (EIA) 2006
3 Long Phu Power Centre  – 4.400MW Thermal Power Project 3 Management Board Strategic environmental assessment 2006
4 Long Phu 1 Thermal Power Plant – 1.200MW Long Phu – Song Hau Thermal Power Project Management Board Environmental Impact Assessment (EIA) 2006
5 Long Phu 2 Thermal Power Plant – 1.200MW TATA power Environmental Impact Assessment (EIA) 2015
6 Duyen Hai 3 Thermal Power Plant – 1.200MW Thermal Power Project 3 Management Board Environmental Impact Assessment (EIA)
Environmental monitoring during construction
2009-2011
2012-2017
7 Song Hau 1 Thermal Power Plant – 1.200MW Long Phu – Song Hau Thermal Power Project Management Board Environmental Impact Assessment (EIA) 2010-2011
8 Duyen Hai 3 Extension Thermal Power Plant – 600MW Thermal Power Project 3 Management Board Environmental Impact Assessment (EIA) 2013-2014
9 Vinh Tan 4 Thermal Power Plant – 1.200MW Vinh Tan Thermal Power Plant Management Board Environmental monitoring during construction phase
Environmental and Social Impact Assessment ESIA
2014-2018
10 Vinh Tan 4 Extension Thermal Power Plant – 600MW Vinh Tan Thermal Power Plant Management Board Environmental Impact Assessment (EIA)
Resettlement and Compensation Plan (RP)
2015-2016
11 Hiep Phuoc LNG Power Plant (Combine cirgle gas turbine) Hiep Phuoc Power Company Limited Environmental Impact Assessment (EIA)

Report of surface water exploiting

2019–2020
12 Son My II CCGT Power Plant AES Group Environmental Impact Assessment (EIA)
General Compensation Plan
2019-2021
13 LNG Bac Lieu Plant Institute of Energy General Compensation and Background environment, ecology Plan 2020-2021