{"id":7259,"date":"2023-06-23T17:02:02","date_gmt":"2023-06-23T10:02:02","guid":{"rendered":"https:\/\/www.pecc3.com.vn\/applying-bim-for-near-shore-wind-farm-design\/"},"modified":"2023-07-07T21:27:36","modified_gmt":"2023-07-07T14:27:36","slug":"applying-bim-for-near-shore-wind-farm-design","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/applying-bim-for-near-shore-wind-farm-design\/","title":{"rendered":"Applying BIM for Near-shore Wind Farm Design"},"content":{"rendered":"\n<p>Faced with the rapidly growing application of Building Information Modeling (BIM) in the construction sector, especially when the Prime Minister issued Decision No. 258\/QD-TTg on March 17<sup>th<\/sup>, 2023 on the approval <em>\u201cRoadmap for the application of Building Information Modeling (BIM) in construction activities\u201d<\/em> has created a new turning point in the field of design, investment management, construction engineering. Power Engineering Consulting Joint Stock Company 3 (EVNPECC3) has made preparations to adapt to new design trends.<\/p>\n\n\n\n<p><h1>PECC3 PREPARATION WORKS<\/h1><\/p>\n\n\n\n<p>Since 2016, PECC3 has organized new training courses for the whole company from management level to design engineer with the goal of soon applying BIM for company\u2019s design field. Today, training work continues to include internal training and attending intensive courses. This has helped the company&#8217;s BIM manpower develop strongly and almost every department in the company has engineers and managers who know to apply BIM.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_001.jpg\" alt=\"\" class=\"wp-image-7236\" width=\"839\" height=\"559\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_001.jpg 990w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_001-300x200.jpg 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_001-768x512.jpg 768w\" sizes=\"auto, (max-width: 839px) 100vw, 839px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center\"><em>Scene of the training course at the office of EVNPECC3<\/em><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-1024x683.jpg\" alt=\"\" class=\"wp-image-7238\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-1024x683.jpg 1024w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-300x200.jpg 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-768x512.jpg 768w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-1536x1024.jpg 1536w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002-1276x851.jpg 1276w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_002.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center\"><p class=\"NOIDUNG\" style=\"text-align: left;\" align=\"center\"><i>Scene of certification celebration after the training course<\/i><\/p><\/p>\n\n\n\n<p>For equipment for BIM work, PECC3 has upgraded, equipped with suitable computers for engineers and managers, also purchased copyrighted softwares. By September 2022, PECC3 officially issued the BIM project implementation procedure for the whole company.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"539\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_003-1024x539.png\" alt=\"\" class=\"wp-image-7240\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_003-1024x539.png 1024w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_003-300x158.png 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_003-768x404.png 768w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_003.png 1155w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"has-text-align-center\"><p class=\"NOIDUNG\" style=\"text-align: left;\" align=\"center\"><i>Core factors for PECC3 BIM development<\/i><\/p><\/p>\n\n\n\n<p>PECC3 has been carefully prepared for manpower, equipment and project implementation procedure, ready for the new design environment and meeting customer requirements in BIM application.<\/p>\n\n\n\n<p><h1>BIM PRODUCT IN RENEWABLE ENERGY FIELD<\/h1><\/p>\n\n\n\n<p>In April 2023, PECC3 completed the BIM-applied design product for the nearshore wind farm project with transmission line, substation, power plant with auxiliary items.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"535\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-1024x535.jpg\" alt=\"\" class=\"wp-image-7243\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-1024x535.jpg 1024w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-300x157.jpg 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-768x401.jpg 768w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-1536x802.jpg 1536w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004-1276x667.jpg 1276w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_004.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The finished product of a BIM project includes but not limited to the following parts:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"438\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-1024x438.jpg\" alt=\"\" class=\"wp-image-7245\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-1024x438.jpg 1024w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-300x128.jpg 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-768x329.jpg 768w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-1536x658.jpg 1536w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005-1276x546.jpg 1276w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/BIM_005.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li><ul><li><strong>CDE (Common Data Environment):<\/strong> Project implementation environment &#8211; where project files, processing requirements, documents between related parties are stored, \u2026<\/li>\r\n<\/ul><\/li>\n\n\n\n<li><ul><li><strong>3D Design: <\/strong>Overall model of the project, allowing to view equipment &amp; other items information, \u2026<\/li>\r\n<\/ul><\/li>\n\n\n\n<li><ul><li><strong>Clash check: <\/strong>handle conflicts and collisions between project items and provide solutions<\/li>\r\n<\/ul><\/li>\n\n\n\n<li><ul><li><strong>2D Design:<\/strong> publish drawings for construction work<\/li>\r\n<\/ul><\/li>\n\n\n\n<li><ul><li><strong>Volume:<\/strong> All elements and equipment on the model are exported in excel format. This makes volume control very effective, saving time and manpower.<\/li>\r\n<\/ul><\/li>\n\n\n\n<li><ul><li><strong>Schedule: <\/strong>The progress of the project according to the plan and actual implementation is exported in Microsoft Project format (*.mpp)<\/li>\r\n<\/ul><\/li>\n<\/ul>\n\n\n\n<p><strong>Project overall<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Tong the NM\u0110G\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/md16jOK0NRs?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p><strong>110kV substation \u2013 control house \u2013 office<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"San tram   Nha dieu khien\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/hnnMQKJK3Q8?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p><strong>Accommodation \u2013 Warehouse \u2013 Guardian house<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"Nha o   Kho   Nha bao ve\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/1BpPmN9wd94?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p><strong>Pedestrian bridge <\/strong><\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"C\u1ea7u d\u1eabn\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/Bws-WVSnVBQ?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Faced with the rapidly growing application of Building Information Modeling (BIM) in the construction sector, especially when the Prime Minister issued Decision No. 258\/QD-TTg on March 17th, 2023 on the approval \u201cRoadmap for the application of Building Information Modeling (BIM) in construction activities\u201d has created a new turning point in the field of design, investment management, construction engineering. Power Engineering Consulting Joint Stock Company 3 (EVNPECC3) has made preparations to&#8230;<\/p>\n","protected":false},"author":3,"featured_media":7246,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[60,45],"tags":[],"class_list":["post-7259","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-event","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/7259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=7259"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/7259\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/7246"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=7259"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=7259"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=7259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}