{"id":7000,"date":"2023-06-02T11:10:03","date_gmt":"2023-06-02T04:10:03","guid":{"rendered":"https:\/\/www.pecc3.com.vn\/navigating-vietnams-power-development-plan-pdp8-and-wind-investment-opportunities\/"},"modified":"2023-06-02T11:28:39","modified_gmt":"2023-06-02T04:28:39","slug":"navigating-vietnams-power-development-plan-pdp8-and-wind-investment-opportunities","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/navigating-vietnams-power-development-plan-pdp8-and-wind-investment-opportunities\/","title":{"rendered":"Navigating Vietnam&#8217;s Power Development Plan (PDP8) and Wind Investment Opportunities"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"656\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-1024x656.jpg\" alt=\"\" class=\"wp-image-6989\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-1024x656.jpg 1024w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-300x192.jpg 300w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-768x492.jpg 768w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-1536x984.jpg 1536w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1-1276x817.jpg 1276w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio1.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>Given the special importance of the electricity industry, on May 15 2023, the Prime Minister issued Decision No. 500\/QD-TTg, approving the Power Development Plan for the period 2021- 2030, vision to 2050 (PDP8) after 2 years of drafting. The approval of #PDP8 is just an important legal milestone. There are numerous actions that must be taken in order to achieve #PDP8\u2019s objectives, the most crucial of which is to provide an environment that is conducive to and safe for business investment so that investors feel confident conducting business there.<\/p>\n\n\n\n<p>Following the recent approval of #PDP8 and the industry&#8217;s enthusiastic response, Leader Associates IMPACT is organizing a special webinar episode titled &#8220;Navigating Vietnam&#8217;s Power Development Plan (PDP8) and Wind Investment Opportunities&#8221; on June 06, to explore the implications of the #PDP8 and delves into the specific investment opportunities and challenges it presents to Vietnam&#8217;s emerging wind sector. <\/p>\n\n\n\n<p>Through this webinar, #EVNPECC3 once again shows its active participation in the field of renewable energy in general and wind energy in particular, with the presence of the following speakers:<\/p>\n\n\n\n<p>\u2736 14:00-14:20 | PDP8 and Policy Development in Wind Energy: What comes next &#8211; Mr Nguyen Ngoc Phuc Dang, Legal Specialist, EVNPECC3<\/p>\n\n\n\n<p>\u2736 14:20-14:40 | Regulatory Update On The Progress of Renewable Energy \u201cTransitional Projects\u201d: What Stakeholders Should Be Aware of &#8211; Mr. Hoang Pham (James), Managing Director, VSE LAWYERS<\/p>\n\n\n\n<p>\u2736 14:40-15:00 | Wind Energy For Green Hydrogen Production: A Brief Study On Its Potential In Vietnam &#8211; Mr Pham Ngoc Hoang Minh, Senior Engineer, EVNPECC3<\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"366\" height=\"542\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio2-2.png\" alt=\"\" class=\"wp-image-7015\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio2-2.png 366w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio2-2-203x300.png 203w\" sizes=\"auto, (max-width: 366px) 100vw, 366px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"356\" height=\"555\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio4-2.png\" alt=\"\" class=\"wp-image-7017\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio4-2.png 356w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio4-2-192x300.png 192w\" sizes=\"auto, (max-width: 356px) 100vw, 356px\" \/><\/figure>\n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"361\" height=\"521\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio3-2.png\" alt=\"\" class=\"wp-image-7020\" title=\"\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio3-2.png 361w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2023\/06\/gio3-2-208x300.png 208w\" sizes=\"auto, (max-width: 361px) 100vw, 361px\" \/><\/figure>\n<\/div>\n<\/div>\n\n\n\n<p>This webinar is also part of the ASEAN Wind Energy 2023 event &#8211; Vietnam&#8217;s largest wind energy conference and exhibition, to be held on Oct 30-31, 2023 in the Adora Centre, Ho Chi Minh City, Vietnam.<\/p>\n\n\n\n<p>Up to now, #EVNPECC3 has implemented more than 100 projects in the field of renewable energy with the ability to provide a full package of services, including: planning; wind resource assessment; preparation of pre-feasibility study report (PreFS), feasibility study report (FS) and planning supplement; integration research; project implementation consultancy; construction supervision; installation and operation, etc.<\/p>\n\n\n\n<p class=\"has-text-align-right\"><strong>Thuy Tien<\/strong><\/p>\n\n\n\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\" style=\"flex-basis:100%\"><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Given the special importance of the electricity industry, on May 15 2023, the Prime Minister issued Decision No. 500\/QD-TTg, approving the Power Development Plan for the period 2021- 2030, vision to 2050 (PDP8) after 2 years of drafting. The approval of #PDP8 is just an important legal milestone. There are numerous actions that must be taken in order to achieve #PDP8\u2019s objectives, the most crucial of which is to provide&#8230;<\/p>\n","protected":false},"author":1,"featured_media":6990,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-7000","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/7000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=7000"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/7000\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/6990"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=7000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=7000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=7000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}