{"id":4971,"date":"2022-01-10T08:35:46","date_gmt":"2022-01-10T01:35:46","guid":{"rendered":"https:\/\/www.pecc3.com.vn\/gioi-thieu-phong-nang-luong-tai-tao-tai-pecc3\/"},"modified":"2022-01-17T12:04:45","modified_gmt":"2022-01-17T05:04:45","slug":"introducing-the-renewable-energy-department","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/introducing-the-renewable-energy-department\/","title":{"rendered":"Introducing The Renewable Energy Department"},"content":{"rendered":"<h2 style=\"text-align: justify;\">The establishment and development of the Renewable Energy Department<\/h2>\n<p style=\"text-align: justify;\">The Renewable Energy Department was established in 2013 during the restructuring of the Company, on the basis of separating the consulting segment on renewable energy (RE) of the Power Grid Project Department. However, consulting services on renewable energy have been provided to customers by the Company since 2004.<\/p>\n<figure id=\"attachment_4815\" aria-describedby=\"caption-attachment-4815\" style=\"width: 765px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-4815 size-full\" title=\"The Renewable Energy Department\" src=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2021\/12\/nang-luong-tai-tao-3.jpg\" alt=\"\" width=\"765\" height=\"508\" srcset=\"https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2021\/12\/nang-luong-tai-tao-3.jpg 765w, https:\/\/www.pecc3.com.vn\/wp-content\/uploads\/2021\/12\/nang-luong-tai-tao-3-300x199.jpg 300w\" sizes=\"auto, (max-width: 765px) 100vw, 765px\" \/><figcaption id=\"caption-attachment-4815\" class=\"wp-caption-text\">The Renewable Energy Department<\/figcaption><\/figure>\n<h3 style=\"text-align: justify;\">Personnel<\/h3>\n<p style=\"text-align: justify;\">The total number of RE specialists includes 10 people, including 3 masters and 7 engineers, with deep understanding of RE technologies, <a href=\"https:\/\/www.pecc3.com.vn\/en\/what-are-the-advantages-of-offshore-wind-power-in-vietnam\/\"><strong><em>especially wind<\/em><\/strong><\/a> and solar power; clearly understand the guidelines and policies of the Government, procedures and processes for the development of RE projects in Vietnam. The specialists, in addition to professional qualifications, are also equipped with English, can easily work with foreign customers.<\/p>\n<p style=\"text-align: justify;\">The main function and task of the RE department is to perform consultancy on potential assessment, planning, site selection, investment project formulation, and design for projects using RE for power generation.<\/p>\n<p style=\"text-align: justify;\">The Department of Renewable Energy is a unit that is always at the forefront of the field of Vietnam&#8217;s renewable energy, understands the Vietnamese power system well, and has experience in successfully implementing RE development planning (wind, solar, biomass) for many provinces, understand and have experience in surveying and screening potential locations for wind and solar energy, identifying the most promising locations for survey and measurement.<\/p>\n<h3 style=\"text-align: justify;\">The bright spot of the renewable energy room<\/h3>\n<p style=\"text-align: justify;\">The department has experience in designing and erecting more than 100 wind measuring masts (height from 45m to 120m) in islands and many provinces such as Ninh Thuan, Binh Thuan, Lam Dong, Soc Trang, Tra Vinh, Ben Tre, Gia Lai, Dak Lak, Binh Dinh, Phu Yen, Quang Binh, &#8230; participate in implementing many wind power and solar power projects with a capacity from a few MW to thousands of MW.<\/p>\n<p style=\"text-align: justify;\">The Department has also participated in many important projects as an independent\/joint venture with international consultants in internationally sponsored projects such as the Vietnam Wind Map project (the investor of the World Bank), the project to collect wind measurement data and policies related to wind power (the investor of the General Department of Energy), the project to install and operate 10 wind measuring masts 80m (the investor of the KfW Bank) and was selected in the above projects.<\/p>\n<p style=\"text-align: justify;\">The experts of RE Department have been invited to contribute expert opinions to many domestic and foreign specialized seminars, the Department is the first consulting unit sought by foreign customers.<\/p>\n<h2 style=\"text-align: justify;\">Representative projects<\/h2>\n<p style=\"text-align: justify;\">During the operation, all officers and employees of the RE Department have constantly made efforts to achieve many achievements and contribute to the company. It is possible to mention typical works marking work achievements.<\/p>\n<h3 style=\"text-align: justify;\">Phu Lac wind power plant:<\/h3>\n<p style=\"text-align: justify;\">Phu Lac is one of the first wind power projects in Vietnam. The Renewable Energy Department has participated in searching, selecting locations, surveying and assessing wind potential and making consulting documents for the project&#8217;s phases. This is a project using a loan from KfW Bank (Germany), requiring international EPC bidding.<\/p>\n<p style=\"text-align: justify;\">The Department of Renewable Energy has entered into a partnership with consultant Fitchner to win the consultancy contract for the implementation of the Phu Lac wind power plant project. Although this is a new type of work, for the first time, the staff of the Renewable Energy Department had to make great efforts to both work and study, but the department successfully completed it without any errors and participated in commissioning successfully, on schedule in September 2016. This is the premise for the Company to continue to provide similar services in the future.<\/p>\n<h3 style=\"text-align: justify;\">Mapping Vietnam&#8217;s wind potential funded by the World Bank:<\/h3>\n<p style=\"text-align: justify;\">Since 2001, the World Bank has published the document Wind Atlas for Southeast Asia, including Vietnam, which is widely used as a document for the development of wind power projects in Vietnam. In the process of using, realizing that there is a big difference between the document and the direct measurement results of the projects, the World Bank plans to re-implement this document through the project &#8220;Assessment of wind resources at selected locations in Vietnam\u201d.<\/p>\n<p style=\"text-align: justify;\">In 2008, the Renewable Energy Department was trusted and selected by the World Bank as a local consultant along with the American consultant (the True Wind Solution) to implement this project. The results of the project are maps of Vietnam&#8217;s wind potential with 3 altitudes of 60m, 80m and 100m, which are used by the Ministry of Industry and Trade and investors as research and evaluation documents on wind potential areas in Vietnam.<\/p>\n<h3 style=\"text-align: justify;\">Installation and operation of ten of 80m-high wind measuring masts sponsored by the GIZ:<\/h3>\n<p style=\"text-align: justify;\">From 2011-2014, in order to promote the development of wind power projects in potential areas through monitoring and providing detailed data sets according to international standards to investors in need, the GIZ sponsored the Ministry of Industry and Trade to install 10 of 80m- high wind measuring masts in localities with wind potential. The Department of Renewable Energy is trusted to implement this project. Through the project, the experts of the Renewable Energy Department better understand the picture of Vietnam&#8217;s wind potential, creating a premise for the unit to be trusted by investors for a series of wind power projects.<\/p>\n<h3 style=\"text-align: justify;\">Vietnam wind power development planning (2012) invested by General Department of Energy (Ministry of Industry and Trade):<\/h3>\n<p style=\"text-align: justify;\">The General Department of Energy is the advisory unit of the Ministry of Industry and Trade on Renewable Energy. Realizing the ability and experience of PECC3 in the field of wind power, in 2012, the General Department of Energy assigned PECC3 to implement the above project. This is Vietnam&#8217;s first and sole project on onshore wind power planning on a national scale. The successful project further enhances PECC3&#8217;s reputation in the field of wind power.<\/p>\n<h3 style=\"text-align: justify;\">Ke Ga offshore wind power project (Thang Long Wind):<\/h3>\n<p style=\"text-align: justify;\">In 2019, the Renewable Energy Department is selected as one of the units participating in the first offshore wind power project in Vietnam (off the coast of Ke Ga Cape, Binh Thuan province with a total expected capacity of 3400MW, phase 1 (600MW) is called Thang Long Wind project). Tasks include participating in making additional planning report, collecting and analyzing wind potential assessment data from Lidar anemometers placed on the rig, &#8230;.<\/p>\n<p style=\"text-align: justify;\">With this project, PECC3 once again is a pioneer consulting unit in the field of offshore wind power in Vietnam. After the Thang Long Wind project, many investors of other offshore wind power projects have come to PECC3 to contract for consulting services for technical assessment, assessment of grid connectivity, assessment of wind potential and layout wind turbine optimization, etc\u2026<\/p>\n<h2 style=\"text-align: justify;\">List of all projects of the Department of Renewable Energy<\/h2>\n<table width=\"730\">\n<tbody>\n<tr>\n<td width=\"588\"><strong>Project\u2019s Name<\/strong><\/td>\n<td width=\"142\"><strong>Year of implementation<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind energy planning for power generation in southern coastal provinces<\/td>\n<td width=\"142\">2006<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Site selection and installation wind measurement mast at 15 wind projects in C\u00f4n \u0110\u1ea3o, B\u1eafc B\u00ecnh, Tuy Phong, Thu\u1eadn B\u1eafc, Ninh Ph\u01b0\u1edbc, Ch\u01b0 Prong, L\u1ea1c D\u01b0\u01a1ng<\/td>\n<td width=\"142\">2007-2009<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS An Phong Wind Power Plant 180MW<\/td>\n<td width=\"142\">2007<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Nh\u01a1n H\u1ed9i Wind Power Plant 27MW<\/td>\n<td width=\"142\">2007<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS \u0110\u00ecnh H\u1ea3i Rice Husk Power Plant 7MW<\/td>\n<td width=\"142\">2007<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Long An bagasse cogeneration plant 30MW<\/td>\n<td width=\"142\">2008<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind resource assessment at selected sites in Vietnam (3 sites in Ninh Thuan, Binh Thuan and Gia Lai), the WB<\/td>\n<td width=\"142\">2008-2011<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Thu\u1eadn Nhi\u00ean Phong Wind Power Plant 50MW<\/td>\n<td width=\"142\">2008<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Ph\u01b0\u1edbc Th\u1ec3 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2008<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Langbiang Wind Power Plant 40MW<\/td>\n<td width=\"142\">2008<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS S\u00e0i G\u00f2n \u2013 B\u00ecnh Thu\u1eadn Wind Power Plant 200MW<\/td>\n<td width=\"142\">2008<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Ph\u00fa L\u1ea1c Wind Power Plant 90MW<\/td>\n<td width=\"142\">2009<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS PVP Wind Power Plant 165MW<\/td>\n<td width=\"142\">2009<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Assessment of wind potential in Lam Dong province<\/td>\n<td width=\"142\">2009<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind power development planning in Binh Thuan province<\/td>\n<td width=\"142\">2009<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Duy\u00ean H\u1ea3i Wind Power Plant 93MW<\/td>\n<td width=\"142\">2010<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Trung Nam Wind Power Plant 90MW<\/td>\n<td width=\"142\">2010<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS v\u00e0 MT Enfinity Wind Power Plant 124.5MW<\/td>\n<td width=\"142\">2010<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind power development planning in Ninh Thuan province<\/td>\n<td width=\"142\">2010<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Power system planning on Phu Quoc island<\/td>\n<td width=\"142\">2011<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Installation and operation of 10 80m-high wind measuring masts at selected locations_GIZ project<\/td>\n<td width=\"142\">2011-2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Vietnam Wind Power Development Plan<\/td>\n<td width=\"142\">2012<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Research on integrating wind power into Vietnam&#8217;s power system<\/td>\n<td width=\"142\">2012<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS IMPSA Wind Power Plant 81.9MW<\/td>\n<td width=\"142\">2013<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Thanh Phong Wind Power Plant 59.4MW<\/td>\n<td width=\"142\">2013<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Pre-FS Hanbaram Wind Power Plant 102.6MW<\/td>\n<td width=\"142\">2013<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Installation and operation of 02 80m wind measuring masts in Da Loan, Lam Dong province<\/td>\n<td width=\"142\">2013<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Research on integrating wind power into Vietnam&#8217;s power system (phase 2)<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Consulting on implementation of Phu Lac Wind Power Plant 24MW<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Verification of Cong Ly wind power project (g\u01112)<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind power development planning in Bac Lieu province<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Cau Dat wind power project 30MW<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Planning for development of power system in Con Dao island<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of TBC Ph\u01b0\u1edbc Minh wind power project 30MW<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Biomass Power Development Plan in Hau Giang province<\/td>\n<td width=\"142\">2014<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Dak N\u00f4ng Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2015<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of V\u0129nh H\u1ea3o Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2015<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Qu\u1ed1c Vinh Wind Power Plant 30MW<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of B\u00ecnh Thu\u1eadn Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ti\u1ebfn Th\u00e0nh BTP Wind Power Plant 20MW<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u1ea7m N\u1ea1i Wind Power Plant 40MW<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Tr\u1ecb An Solar Power Plant 126MWp<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Sao Mai Solar Power Plant 210MWp<\/td>\n<td width=\"142\">2016<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Srepok 4 Solar Power Plant (100MWp)<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of C\u01b0 Jut Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of D\u1ea7u Ti\u1ebfng Lake Solar Power Plant 2,000MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110a D\u00e2ng 2 Solar Power Plant (20MWp)<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of M\u1ef9 S\u01a1n Solar Power Plant 100MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Qu\u1ea3ng Tr\u1ecb Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ph\u00fa Y\u00ean Solar Power Plant 100MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of V\u0129nh Long Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of B\u1eafc B\u00ecnh Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Sonadezi Ch\u00e2u \u0110\u1ee9c Solar Power Plant 100MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of GAIA Long An Solar Power Plant 100MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Thu\u1eadn Nhi\u00ean Phong Solar Power Plant 86MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of BCG B\u0103ng D\u01b0\u01a1ng\u00a0 Solar Power Plant 40MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Red Sun Th\u1ea1nh An Solar Power Plant 60MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of T\u00e2n Ch\u00e2u Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ph\u01b0\u1edbc H\u1eefu \u0110L1 Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of H\u1ed3ng Phong 3.3 Solar Power Plant (50MWp)<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of V\u0129nh H\u1ea3i Wind Power Plant 40MW<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u1ea7m N\u1ea1i Wind Power Plant phase 2 (34MW)<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Verification of \u0110a Mi Floating Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">RE Power Development Plan in Tay Ninh Province<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of\u00a0 B&amp;T Wind Power Plant 200MW<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Solar Power Development Plan in S\u00f3c Tr\u0103ng Province<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ho\u00e0n C\u1ea7u Long An Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of\u00a0 Ch\u00e2u Pha Solar Power Plant 48MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of\u00a0 Goldwind Wind Power Plant 22MW<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Solar Power Development Plan in An Giang Province<\/td>\n<td width=\"142\">2017-2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of V\u0103n Thanh Wind Power Plant phase 2 (50MW)<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of H\u1ed3ng Phong 3.5 Solar Power Plant 48MWp<\/td>\n<td width=\"142\">2017<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u1ed3ng Xo\u00e0i Solar Power Plant 48MWp<\/td>\n<td width=\"142\">2017-2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Power supply for Bach Long Vy island district<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Easup Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of BMT Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Marshal An Giang Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Technical review of Sinenergy Solar Power<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u1ea7m N\u1ea1i 4 Wind Power Plant<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Verification of the FS of S\u00f4ng B\u00ecnh 1 Solar Power Plant 50MW<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Wind Power Development Plan in Qu\u1ea3ng B\u00ecnh province<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u1ed3ng N\u01a1 Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Sunpro-B\u1ebfn Tre No.8 phase 1 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Preparing the PPA for Tuy Phong Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Goldwind phase 2 Wind Power Plant<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of L\u1ee3i H\u1ea3i 2 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of H\u01b0\u1edbng Ph\u00f9ng 1 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2018<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Banpu S\u00f3c Tr\u0103ng phase 1 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2018-2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of s\u1ed1 3 (Banpu) g\u0111 2 Wind Power Plant 30MW<\/td>\n<td width=\"142\">2018-2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Korea &#8211; Tr\u00e0 Vinh phase 1 Wind Power Plant 48MW<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of AMI AC D\u0103k L\u0103k Wind Power Plant 202.5 MW<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Goldwind phase 1 Wind Power Plant<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Evaluation of wind potential in K\u00ea G\u00e0 Off-shore Wind Power Plant 3,400MW<\/td>\n<td width=\"142\">2019-2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u00c1i T\u1eed Floating Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Technical Design for Sao Mai Solar Power Plant 106MWp<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of An Bi\u00ean Solar Power Plant 11MWp<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Preparing FS, Detailed Design for complex of RE projects in Deep C industrial park<\/td>\n<td width=\"142\">2019-2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ph\u00fa L\u1ea1c phase 2 Wind Power Plant &#8211; 26MW<\/td>\n<td width=\"142\">2019-2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ch\u00ed C\u00f4ng \u2013Phong Ph\u00fa Solar Power Plant 50MWp<\/td>\n<td width=\"142\">2019<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Trung Nam Tr\u00e0 Vinh (V3-6) Wind Power Plant 348MW<\/td>\n<td width=\"142\">2019-2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Research report for the development of Soc Trang Off-shore Wind Project<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Ph\u01b0\u1edbc Nam Enfinity Wind Power Plant 65MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of An Thu\u1ef7 Wind Power Plant 50MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Development of Technical Risk Management Guidelines for Ground Mounted Solar Projects<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of H\u00f2n \u0110\u1ea5t Waste-to-Energy Power Plant 10MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Evaluating the grid impact of Gia Lai Wind Power Plant 120MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of \u0110\u0103k R\u01a1 Sa Solar Power Plant 30MWp<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of Xanh S\u00f4ng C\u1ea7u phase 1 Wind Power Plant (50MW)<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS of \u0110\u00f4ng H\u1ea3i 1 (V1-7) Wind Power Plant 125MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Verification of FS of H\u00e0m Ki\u1ec7m Wind Power Plant 15MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Technical Design\/ Detailed Design of \u0110\u00f4ng H\u1ea3i 1 (V1-7) Wind Power Plant 125MW<\/td>\n<td width=\"142\">2020-2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ba Tri Off-shore Wind Power Plant 800MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Thanh Phong Wind Power Plant 50MW<\/td>\n<td width=\"142\">2020<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Ch\u01b0 Prong 3 Wind Power Plant 150MW<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">FS NM\u0110G Hi\u1ec7p Th\u1ea1nh 3 (V3-8) Wind Power Plant 210MW<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Evaluation of wind potential, micro siting for turbines at Co Thach Off-shore Wind Power Plant 2,000MW<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of L\u1ee5c Ng\u1ea1n Wind Power Plant 78MW<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Support to apply for a license to survey the wind potential of Binh Thuan Off-shore Wind Power Plant 1,500MW<\/td>\n<td width=\"142\">2021-2022<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Supplementing the planning of Korea- Tr\u00e0 Vinh g\u01112 Wind Power Plant (48MW)<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<tr>\n<td width=\"588\">Technical Design of No.18 S\u00f3c Tr\u0103ng Wind Power Plant<\/td>\n<td width=\"142\">2021<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"text-align: justify;\">The Renewable Energy Department is considered as the solution and trend of all elements of energy in the world today. PECC3 hopes that a company-wide effort will bring renewables back into the mainstream in the coming years. To make up, the room quality up must be grapation the same family of PECC3 aims to devise special development strategies.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The establishment and development of the Renewable Energy Department The Renewable Energy Department was established in 2013 during the restructuring of the Company, on the basis of separating the consulting segment on renewable energy (RE) of the Power Grid Project Department. However, consulting services on renewable energy have been provided to customers by the Company since 2004. Personnel The total number of RE specialists includes 10 people, including 3 masters&#8230;<\/p>\n","protected":false},"author":1,"featured_media":4815,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-4971","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/4971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=4971"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/4971\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/4815"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=4971"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=4971"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=4971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}