{"id":2155,"date":"2020-03-02T09:01:59","date_gmt":"2020-03-02T02:01:59","guid":{"rendered":"https:\/\/web.pecc3.com.vn\/?p=2155"},"modified":"2021-04-14T10:51:10","modified_gmt":"2021-04-14T03:51:10","slug":"groundbreaking-hiep-thanh-wind-power-plant-tra-vinh","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/groundbreaking-hiep-thanh-wind-power-plant-tra-vinh\/","title":{"rendered":"GROUNDBREAKING HIEP THANH WIND-POWER PLANT, TRA VINH"},"content":{"rendered":"\n<p>On February 28, 2020 &#8211; Construction of Hiep Thanh wind-power plant at a cost of nearly 3.37 trillion VND (145.9 million USD) began in Tra Vinh province.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/2020\/hiep%20thanh_tra%20vinh\/1.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>Groundbreaking ceremony<\/p>\n\n\n\n<p>Twenty percent of the total investment comes from its investor &#8211; Ecotech Tra Vinh Renewable JSC &#8211; while the remainder is loans provided by the investment fund Climate Investment One of the Netherlands and Korean Samtan International Co, the online newspaper congthuong.vn reported.<\/p>\n\n\n\n<p>The plant covers a site of more than 2,700ha in the coastal commune of Hiep Thanh in Duyen Hai township and has a designed capacity of 78MW from 18 turbines.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/2020\/hiep%20thanh_tra%20vinh\/2.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>Team PECC3 at the ceremony<\/p>\n\n\n\n<p>EVNPECC3 works at Hiep Thanh wind-power plant includes: Topographic and Geological Survey serving Feasibility Study; Establishment Feasibility Study; Preparation EIA and Fire Prevention report; Preparation Related agreement for applying PPA; Preparing EPC tender documentation and support the Client to negotiation of EPC contract.<\/p>\n\n\n\n<p>The plant is expected to be completed in mid-2021.<\/p>\n\n\n\n<p class=\"has-text-align-right\"><strong><em>Duy Khanh<\/em><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>On February 28, 2020 &#8211; Construction of Hiep Thanh wind-power plant at a cost of nearly 3.37 trillion VND (145.9 million USD) began in Tra Vinh province. Groundbreaking ceremony Twenty percent of the total investment comes from its investor &#8211; Ecotech Tra Vinh Renewable JSC &#8211; while the remainder is loans provided by the investment fund Climate Investment One of the Netherlands and Korean Samtan International Co, the online newspaper&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2156,"comment_status":"closed","ping_status":"closed","sticky":true,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-2155","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2155","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2155"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2155\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/2156"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}