{"id":2135,"date":"2019-09-24T08:52:04","date_gmt":"2019-09-24T01:52:04","guid":{"rendered":"https:\/\/web.pecc3.com.vn\/?p=2135"},"modified":"2021-04-14T13:18:15","modified_gmt":"2021-04-14T06:18:15","slug":"inauguration-ceremony-of-vinh-tan-4-thermal-power-plant-2x600mw","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/inauguration-ceremony-of-vinh-tan-4-thermal-power-plant-2x600mw\/","title":{"rendered":"Inauguration Ceremony of Vinh Tan 4 Thermal Power Plant \u2013 (2x600MW)"},"content":{"rendered":"\n<p>On September 21, 2019, in the Inauguration Ceremony of Vinh Tan 4 Thermal Power Plant Project (Vinh Tan 4 TPP), one of the national important projects on power network, Deputy Prime Minister \u2013 Mr. Truong Hoa Binh commended EVN and relevant authorities for 3 months earlier operation with safe and reliable quality and environmental protection regulations.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/2019\/VT4\/vt4-26092019-01.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>Deputy Prime Minister Truong Hoa Binh cuts the ribbon<\/p>\n\n\n\n<p>At the ceremony, the Deputy Prime Minister asked EVN to promote applicating of science, technology and safe, reliable management and operation in order to contribute to ensuring the electricity supply for the country and no environmental pollution during the operation of the plant.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/2019\/VT4\/vt4-26092019-02.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>Deputy Prime Minister \u2013 Mr. Truong Hoa Binh speaks at the ceremony<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/2019\/VT4\/vt4-26092019-03.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>The units get rewarded for a certificate of merit at the ceremony<\/p>\n\n\n\n<p>Vinh Tan 4 TPP:<br>&#8211;&nbsp;&nbsp; &nbsp;The Ower: EVN<br>&#8211;&nbsp;&nbsp; &nbsp;Started: March, 2014<br>&#8211;&nbsp;&nbsp; &nbsp;Operation: March 31, 2018, 3 months earlier operation<br>&#8211;&nbsp;&nbsp; &nbsp;Output: 7.2 billion kWh\/year<br>&#8211;&nbsp;&nbsp; &nbsp;Output up to now: 10.6 billion kWh<\/p>\n\n\n\n<p>As the main consultant for the project owner on project management and construction supervision, with the professional, dynamic, creative team and dedicated construction engineers, EVNPECC3 contributed to the overall success of the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On September 21, 2019, in the Inauguration Ceremony of Vinh Tan 4 Thermal Power Plant Project (Vinh Tan 4 TPP), one of the national important projects on power network, Deputy Prime Minister \u2013 Mr. Truong Hoa Binh commended EVN and relevant authorities for 3 months earlier operation with safe and reliable quality and environmental protection regulations. Deputy Prime Minister Truong Hoa Binh cuts the ribbon At the ceremony, the Deputy&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2136,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-2135","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2135"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2135\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/2136"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2135"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2135"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}