{"id":2102,"date":"2017-03-30T08:34:40","date_gmt":"2017-03-30T01:34:40","guid":{"rendered":"https:\/\/web.pecc3.com.vn\/?p=2102"},"modified":"2021-04-14T13:19:15","modified_gmt":"2021-04-14T06:19:15","slug":"hand-over-and-put-into-operation-unit-no-1-of-duyen-hai-3-thermal-power-plant-project","status":"publish","type":"post","link":"https:\/\/www.pecc3.com.vn\/en\/hand-over-and-put-into-operation-unit-no-1-of-duyen-hai-3-thermal-power-plant-project\/","title":{"rendered":"Hand over and put into operation Unit No. 1 of Duyen Hai 3 thermal power plant project"},"content":{"rendered":"\n<p>At 15:0 p.m. March 29, 2017, Unit No. 1 with capacity of 622.5 MW of Duyen Hai 3 TPP has been handed over successfully to Duyen Hai thermal power company. This is a key milestone for officially putting the unit of the project into commercial operation, contributing an important role to supply timely power for the South, especially in dry season of 2017.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/nhiet_dien\/dh3\/dh3_0001.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.pecc3.com.vn\/upload\/userfiles\/images\/nhiet_dien\/dh3\/dh3_0002.jpg\" alt=\"\" title=\"\"><\/figure>\n\n\n\n<p>Picture: Hand-over moment of Unit No.1 of Duyen Hai 3 TPP<\/p>\n\n\n\n<div>Duyen Hai 3 TPP is in Duyen Hai power complex. It consists of two units with total installed capacity of 1,245 MW (2&#215;622.5 MW). Annual power output generated will be about 7.8 billion kWh (equivalent to about 9% power output of the South in 2017). Main information about the project is as follows:<\/div>\n\n\n\n<div>&#8211; Location: Duyen Hai 3 TPP locates in Duyen Hai power complex, at Mu U Hamlet, Dan Thanh Commune, Duyen Hai District, Tra Vinh Province.<\/div>\n\n\n\n<div>&#8211; Owner: GENCO 1<\/div>\n\n\n\n<div>&#8211; Owner\u2019s representative: TPPMU3<\/div>\n\n\n\n<div>&#8211; Owner\u2019s Main Consultant: PECC 3<\/div>\n\n\n\n<div>&#8211; Sub-consultant: FICHTNER GmbH &amp; Co. KG<\/div>\n\n\n\n<div>&#8211; EPC Contractor: Joint-venture of CHENGDA ENGINEERING CO. LTD. \u2013 DONGFANG ELECTRIC CORPORATION LTD. \u2013 SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE \u2013 ZHEJIANG ELECTRIC POWER CONSTRUCTION CO. LTD.<\/div>\n\n\n\n<div>&nbsp;<\/div>\n\n\n\n<div>&nbsp;<\/div>\n\n\n\n<div>&nbsp;<\/div>\n\n\n\n<div style=\"text-align: right;\"><em>Phan Bach Khoa<\/em><\/div>\n","protected":false},"excerpt":{"rendered":"<p>At 15:0 p.m. March 29, 2017, Unit No. 1 with capacity of 622.5 MW of Duyen Hai 3 TPP has been handed over successfully to Duyen Hai thermal power company. This is a key milestone for officially putting the unit of the project into commercial operation, contributing an important role to supply timely power for the South, especially in dry season of 2017. Picture: Hand-over moment of Unit No.1 of&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2103,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_custom_percent_image":"","footnotes":""},"categories":[45],"tags":[],"class_list":["post-2102","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2102","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/comments?post=2102"}],"version-history":[{"count":0,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/posts\/2102\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media\/2103"}],"wp:attachment":[{"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/media?parent=2102"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/categories?post=2102"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.pecc3.com.vn\/en\/wp-json\/wp\/v2\/tags?post=2102"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}